Bay Avenue Pump Station Upgrade Design / Build Project

The Bay Avenue Pump Station Upgrade Design / Build Project work involves the following:
  • Installation of a new generator / switchgear / transformer up on Bay Avenue,
  • upgrading the station in place by raising the existing wetwell approximately 4.3m,
  • providing a graded vehicle access to the pump station,
  • upgraded odour control,
  • constructing a new caisson / secant pile ring wet well,
  • installation of three pumps into the existing upgraded wet well and two pumps in the new wet well,
  • construction of a new dry well for piping, valves, pig loader, metering and controls,
  • building retaining walls (piled footing / foundation walls) around the site and enclosing the dry well station with a pre-engineered building.
The RDN has allocated $3.4 million in Canadian Dollars for the design and construction of the Project.

Issued:

October 11, 2018

Project Information:

A non-mandatory site information meeting is scheduled for:
Date: October 24, 2018
Time: 10:00am
Location: Regional District of Nanaimo, Board Chambers, 6300 Hammond Bay Road, Nanaimo, BC V9T 6N2

Closing Date/Time/Location:

3 complete hard copies plus 1 electronic (CD or USB) copy prepared in .pdf format of each Response must be received before 2:00 PM Local Time on December 13, 2018

Regional District of Nanaimo
Regional and Community Utilities
Main Reception - Second Floor
6300 Hammond Bay Road
Nanaimo, BC V9T 6N2

Regional District of Nanaimo (RDN) Contact for Questions:

Mike Squire, AScT
Project Engineer, Engineering Services
Phone 250-390-6560
Fax 250-390-1542